My Bernina quilting Frame arrived on Friday.
It was brought down from Perth - about 180kms away, and put together for me!
Well - I think I must have been really tired and a little tipsy.. we had a visitor, and it was that time of the evening.
On Friday I watched the Bernina video on YouTube several times before I worked out how to just put put the fabic on !
As you can see I have a real mess in my studio!
On Saturday I finally got all the fabric and batting worked out.
Did some very strange quilting on Saturday .. and thought - my gaad what have I done.
This is the last thing I did yesterday - which was also my first day at the quiltingon the frame
I wrote to one of my online friends Rhianon Taylor
who also has one of these frames...and she was REALLY helpful.
She made me feel loads better! Also suggested a stool to sit on.
I now have a kitchen stool in place to sit on and my DH found a box for me to put my foot pedal on. I really have not been able to use the BSR - 1 or 2.
I have a stop start button coming soon.
This was my effort today... and now I will have a bit of a break and come back to it later.
We have an overseas visitor arriving tomorrow and I need to get some other things done.
So - sore neck sore back and lots of work ahead of me!!


